RB Rail AS, the Rail Baltica joint venture and central coordinator is preparing to announce a new procurement for full scope implementation of the Control-Command and Signalling subsystem (CCS) for the Rail Baltica mainline.
Technical scope of CCS subsystem includes:
- ETCS;
- FRMCS radio communication system;
- Interlocking system;
- Traffic management system;
- ICT systems: Data Transmission network, Voice communication, Cyber security;
- Ancillary systems: for railway operation communication, monitoring applications, SCADA;
- Station equipment on stations: Passenger Information/Address, CCTV, Master Clock, ticketing system;
- Non traction power supply for CCS subsystems;
- Cableway system for all systems;
- Technical buildings/technical premises;
We are thereby inviting all interested suppliers who deliver full scope of railway CCS sub-system (including design, construction, commissioning, and equipment supplies) for large-scale projects to apply for individual consultations with representatives of RB Rail AS which will be held from 22 to 26 August 2022 at the Rail Baltica headquarters in Riga, Latvia (address: Satekles 2b, Riga).
In total 16 (sixteen) timeslots up to 1,5 (one and a half) hours will be available and spread from 8 a.m. to 7 p.m. (EEST) in the previously provided dates. We hope to organize face-to-face, if wished by suppliers, meetings, however considering the Covid-19 health safety requirements, online sessions using Microsoft Teams platform may be used for conducting these meetings.
During the meeting, suppliers will be introduced with the Rail Baltica project, its’ time schedule and procurement plan in the field of the subject matter. The subject matter of this procurement is full scope deployment of CCS subsystem for Rail Baltica Global project by preparing the necessary designs, supplying the materials, implementing the construction works, followed by commissioning works.
Meeting Agenda:
Introduction to the Rail Baltica project and project schedule.
Information on the planned scope and timeline for the implementation of full scope of CCS subsystem.
Q&A session:
- Part 1: RB Rail AS questions to suppliers
- Part 2: Suppliers’ answers
- Part 3: Suppliers’ questions
- Part 4: RB Rail AS answers.
The meetings will focus on (1) works scope and timeline, (2) construction phase management, (3) resources allocation, (4) expectations towards main contractual requirements, (5) pricing and payment conditions and expectations, (6) risks and risk mitigation measures, (7) expectations towards the procurement process, requirements, evaluation, and documentation.
Meetings will be recorded and a summarized version of the minutes of all meetings will later be made available online at www.railbaltica.org. For the purposes of fair treatment of all suppliers and potential tenderers, RB Rail AS shall publish significant information shared with the Tenderers. Video recordings from the e-meetings will not be distributed to the suppliers and/or third parties.
The maximum number of meetings is limited to 16 (sixteen), with no more than 4 (four) representatives from one potential supplier allowed in the meeting. The applications meeting the requested supplier profile will be registered on a first-come-first-served basis, and RB Rail AS will confirm the participation of the supplier by sending a confirmation e-mail to the e-mail address provided in the application.
Application deadline
RB Rail AS will send out a questionnaire to be filled in and submitted not later than on 10 August 2022 and discussed during the meetings to the respective suppliers 6 (weeks) weeks before the scheduled meeting.
The application process to participate in market consultation about the approaching Control Command and Signalling (CCS) subsystem procurement for the Rail Baltica Global Project has been closed.
At the Supplier Meetings, RB Rail AS shall make no promises and/or commitments towards any business agreement or any proposal and shall not provide any acceptance of any offers or potential offers. The Supplier Meetings are intended to inform RB Rail AS on the significant full scope CCS subsystem implementation related market conditions as well as provide input into the development of the procurement conditions. At these meetings, RB Rail AS is not able to discuss any other topics than the subject matter and shall not provide any information on any ongoing procurement procedures.
Documents (Downloads)